Two way
Both systems stay the same. Every sync runs from the leading system into the other, then back.
- You pick whether FreeAgent or Zoho CRM leads
- Changes on either side travel
- Nothing bounces back and forth
CRM Connector Platform
Contacts stay the same both ways. A deal won in Zoho CRM becomes a draft FreeAgent invoice, and a sent FreeAgent estimate becomes a deal that follows it.
Contacts both ways, won work into draft invoices
At a glance. Contacts stay the same. A won deal becomes a draft invoice, and a sent estimate a deal.
Your choice
Keep both systems identical, or let one feed the other. You decide per record type.
Both systems stay the same. Every sync runs from the leading system into the other, then back.
One system feeds the other. Pick FreeAgent or Zoho CRM as the source; the other receives.
Record by record
Pick a record type and the system where a change starts. On the left, which field matches which and when it travels; on the right, what that change does on the other side.
It happens in FreeAgent, then in Zoho CRM
A new contact
Looked for in Zoho CRM on the exact email before a contact is created.
Name, company, email, phone or address changes
The same change is made to the Zoho CRM contact on the next sync.
How a sync runs
What happens every time the integration runs, in the order it really happens. Pick which system leads and watch the records move.
Step 1 of 7
Credentials for FreeAgent and Zoho CRM are checked and sign in tokens refreshed automatically. If a connection was removed on either side, the integration pauses and you get one message with a reconnect button.
Conflicts
Between two syncs
The phone number of the same contact is changed in both systems
Two different values. Run the sync to see which one both systems end up with.
Good to know
What holds for FreeAgent or Zoho CRM on its own is on its own page.
FAQ
Every answer below is true for the app as it runs today. If something is not covered, ask us and we will answer in plain words.
Sign in to FreeAgent and Zoho CRM, pick which one leads or sync one way, confirm what syncs, and watch the first sync run.